Back

Tunnel construction with DYNAJET in Copenhagen

High-pressure water-jetting systems support surface preparation in tunnel construction and renovation. See how DYNAJET was used on one of Denmark's largest infrastructure projects.

DYNAJET tunnel construction copenhagen
Professional hot-water surface preparation with up to 500 bar precision for demanding tunnel construction projects

The professional choice 
in water-jetting technology.  

The Nordhavnsvej Tunnel in Copenhagen is one of Denmark's most significant infrastructure projects. The four-lane tunnel runs 1.65 km below the Danish capital, with a diameter of two times 14 m, connecting the Nordhavn district to the Helsingør motorway. For surface preparation of the tunnel walls, the contractor selected DYNAJET.

The DYNAJET 500th was deployed in both tunnel tubes. With working pressure steplessly adjustable up to 500 bar, the machine removed concrete residue, splatters and other contamination from the walls quickly and reliably, leaving the surface ready for the final concrete application.

Tunnel construction and renovation place strict demands on surface preparation. Walls must be free of residue before new concrete or coatings can be applied, and the work often has to be carried out in confined spaces with limited access. DYNAJET water-jetting systems are built for exactly these conditions, combining adjustable pressure, hot water capability and a compact setup that works within the constraints of an active construction site.

DYNAJET water-jetting systems are established equipment on large infrastructure projects worldwide, including tunnel construction, motorway renovation and major urban development sites.

SURFACE PREPARATION WITH THE RIGHT EQUIPMENT

The WSS water-sandblasting attachment connects directly to the DYNAJET 500th and uses garnet sand as the blasting medium, making it suitable for removing stubborn residue from concrete and other hard surfaces.

Wss
REMOVES CONCRETE RESIDUE FROM TUNNEL WALLS

High-pressure water-jetting removes concrete splatters and contamination from tunnel walls quickly and reliably, leaving the surface ready for the final concrete application.

DYNAJET tunnel construction, view 3